When Accusoft Headquarters wanted to renovate its existing building, the city of Tampa said the building needed a smoke control system unless a fire protection engineer indicated otherwise.

Challenge

The scope of the project included modifying approximately 7,000 square feet of the first-floor office space and the atrium roof; the communicating space was not considered an atrium upon initial building construction permitting, and an interpretation of the code officials was that the modifications resulted in possible more hazardous conditions as they relate to life safety.

Solution

We performed a comparative fire modeling analysis, examining smoke movement and available safe egress times (ASET) based on the existing conditions to the proposed updates to the space. The modeling effort demonstrated that the new proposed conditions afforded an increase in life safety than the existing conditions.

Bottom Line

We saved the client approximately $500,000 in construction cost, plus additional revolving annual maintenance costs.

References

Florida Building Code (FBC)

Florida Fire Prevention Code (FFPC)

Fire Dynamics Simulator (FDS)

Expert Guidance. Proven Protection.

Work with the partner who knows the codes, understands the risks, and delivers solutions you can trust. 

Thank you for business and allowing us to serve you.

You are about to leave the Summit Fire Consulting website.  By clicking the “Submit Payment” button below, you will be connected to our Payment Center, a third-party site which will allow you to make a payment on your account. 

If you want to remain on this site and contact us for more information, please visit here.