Aquarium Rooftop Amenity Deck

Exposure analysis of unprotected steel structure

Challenge

A portion of the aquarium rooftop is transformed into an event venue space with the addition of a new retractable pavilion. Based on the existing construction type of the building, prescriptive code dictates that the new pavilion must be provided with spray-applied fireproofing or intumescent paint to match the fire resistance rating of existing structural elements. In addition to the exorbitant installation cost, ongoing maintenance requirements and unsightly appearance, the spray-applied fireproofing was reason for much concern with the aquarium. Any overspray during application could harm the sharks!

Solution

We performed fire modeling to evaluate how the omission of spray-applied fireproofing would impact the structural performance of the pavilion. We also simulated the occupant evacuation from the space to ensure adequate time to safely egress. Through this holistic performance-based design analysis, we determined that in the event of a worst-case fire scenario the unprotected steel did not exhibit any reduction in structural performance and the occupants experienced safe conditions throughout egress.

Bottom Line

  • $200,000 of savings in construction costs
  • Eliminated risk of poisoning sharks

 

References

International Building Code (IBC) – Table 601

Expert Guidance. Proven Protection.

Work with the partner who knows the codes, understands the risks, and delivers solutions you can trust. 

Thank you for business and allowing us to serve you.

You are about to leave the Summit Fire Consulting website.  By clicking the “Submit Payment” button below, you will be connected to our Payment Center, a third-party site which will allow you to make a payment on your account. 

If you want to remain on this site and contact us for more information, please visit here.